Vinyl Pool Construction Process

Jersey Pools & Spas Inc. uses world class standards and practices in every build we perform. From the simplest of pools to the most complex designs, one of our owners or managers are on the job, guaranteeing the best result for our clients. These exacting standards and practices are why Jersey Pools & Spas Inc. has been the recipient of numerous awards, certifications and industry acknowledgements.

Vinyl Swimming Pool Construction Plan

 

Pre-excavation

  • Develop complete construction plan, to be approved by owner.
  • Lay out pool in yard, for owner approval.
  • Secure as necessary construction permits.
  • Review equipment location, access, and stock pile location.

Excavations

  • Access yard through approved access arrangement.
  • Expert excavation, backfilling, grading, and excess dirt removal.
  • Control water as needed. (additional charges will apply)
  • Grade access area upon departure.

Walls

  • Place level steel walls and braces to shape pool.
  • Install concrete foundation to secure walls for the lifetime of the pool.
  • Provide for all skimmers, lights, and additional features.
  • Install Acrylic pool step.

Plumbing

  • Plumb all suctions on independent lines with valve better than ANSI 7 specified 6 FPS line velocity using ASTM 1785 approved material.
  • Plumb returns to insure no dead spots in pool better than ANSI 7 8 FPS.
  • Install light niches per plan.
  • Plumb for specified cleaning system.

Equipment

  • Install all specified equipment as per ASTM and MFG specifications.

Electrical

  • Install pool-grounding wires as per National electric code 680.
  • Wire all equipment and install g.f.c.i. within 100′ to main electrical source.
  • Wire NEMA 4 rated control system as specified.
  • Install convenience light switch at equipment location.

Pool Interior

  • Use only dry mixed Vercon floor material.
  • Trowel smooth Vercon walls and floor.
  • All walls and floor to be 2” to 4” thick.

Liner

  • Install 20 – 28 Mill Virgin vinyl liner.
  • Install aluminum tracking to accept liner.
  • Install 1/8″ Wall foam on pool walls.
  • Install safety rope and float system including safety signs.

Decking

  • Install all concrete per plan using ACI specifications.
  • Provide sleeves in deck for added protection against settling if needed.
  • Provide drains for decking if needed. (additional charges will apply)

Start up

  • Clean construction site.
  • Turn on and check operation of all equipment.
  • Instruct owner on proper operation of entire system.